Case study · Concept project

Training a city's meter readers to get every read right

A complete, phone-first training program designed for a small city's Water Division: eight lessons, eight interactive cartoon how-tos with the city's own staff as characters, and the field job aids to back them up. Built as a proposal to show the City of McComb what the program would look like.

City of McComb seal above a gold ribbon reading Meter Reading Training
CLIENT
City of McComb, Mississippi (proposal)
SECTOR
Local government · Public Works, Water
MY ROLE
Learning experience designer, developer, art and animation direction
DELIVERY
SCORM 1.2 · phone and desktop · about 60 min
STATUS
Concept, proposed to the city, 2026
01 · THE PROBLEM

Read errors become billing problems

Public reporting showed McComb working through meter software issues and billing discrepancies. A wrong read means a wrong bill, a re-read and a call to City Hall. New hires learn by shadowing, and the veterans' know-how about stuck meters, tampering and safety isn't written down anywhere.

02 · THE LEARNERS

Field staff with no desk time

Meter readers and field technicians, from first-month hires to 20-year veterans, plus the crew leads who coach them. They work outside, on a phone, often in the heat. The training had to be short, visual and built around real stops on a real route.

03 · THE APPROACH

The Benchmark Method, stage by stage

  1. STAGE {{ s.n }}{{ s.l }}

    {{ s.b }}

04 · FRAMEWORKS AND LEARNING THEORY

The theory behind each choice

{{ f.h }}{{ f.b }}
05 · KEY DESIGN DECISIONS

What shaped the build

{{ d.h }}{{ d.b }}
06 · TRY THE SAMPLE

Play the first three lessons

From Meter to Bill, Stop, Look, Then Read, and Reading the Register. Each includes its cartoon with Watch, Try it and Practice, plus the activities and job aids.

Open the sample in a new tab →
07 · EVIDENCE AND RESULTS

What the city would measure

This is a concept, so there is no pilot data yet. These are the targets in the proposal, each measured against the city's own baseline at 30, 60 and 90 days.

{{ t.v }}{{ t.l }}{{ t.s }}

What was delivered

  • {{ x.t }}

Have field staff who need training that works on the job?

Start a project